Africa Sourcing Intelligence
Hotels in West and Central Africa: 30 tracked projects and what they will buy (October 2026)
About thirty hotels planned or under construction in six countries of West and Central Africa: where they stand and which supplies they will order.
Published 2026-10-10 · updated 2026-10-19 · Atlas to Africa
As of 10 October 2026 we track about thirty hotel projects in six countries of West and Central Africa: 30 distinct projects, 13 of them under construction, 6 in design and 11 announced without visible works. Broken down into supply needs, they represent more than 200 purchase lines on which Moroccan manufacturers are positioned: furniture and fit-out, lighting, sanitary ware and taps, air conditioning, linen, professional kitchens, tiles.
This article gives the state of that tracking, country by country, in aggregate form. It relies only on publicly announced projects; the details of the projects and their owners remain reserved for registered suppliers.
What these hotels buy
The same product families appear in almost every file, in this order:
| Product family | Projects concerned (approx.) | Note |
|---|---|---|
| Furniture, fit-out and FF&E | 40 | rooms, lobbies, restaurants: the first budget line, and the most open to made-to-measure Moroccan manufacturers |
| Lighting | 30 | decorative and technical, often bought with the fit-out |
| Sanitary ware and taps | 30 | specified by the brand, sourced by the developer |
| Air conditioning and ventilation | 25 | a technical package decided early with the engineering firm |
| Hotel linen and textiles | 25 | ordered in the six months before opening |
| Professional kitchens and laundry | 20 | a heavy package, very often imported |
| Tiles and ceramics | 12 | large volumes on beach resorts |
Three practical lessons. First, timing: decoration, linen and kitchens are decided in the twelve months before opening, while air conditioning, sanitary ware and tiles are fixed during the structural works. Second, the international brand sets a specification, but the owner or its general contractor places the order. Third, proximity: for Dakar, Abidjan or Cotonou a Moroccan manufacturer delivers by sea in two to three weeks, against six to eight from Asia, which matters on sites where opening dates slip.
Country by country
Senegal: the 2026-2028 wave of openings
Seven tracked projects, the most active market right now. They include beach resorts on the coast, upscale international-brand hotels in Dakar, new or being extended, and hotels built into mixed-use complexes (offices, retail, apartments) on the outskirts of Dakar. Some are under construction, others in financing, with openings staggered up to 2028.
Cameroon: upscale in Douala and Yaoundé
Eight projects, carried by private investors and institutions: upscale and international-brand hotels in Douala and Yaoundé, both new builds and renovations, a five-star resort project on the coast and a mid-sized business hotel on the outskirts of Douala.
Gabon: Libreville and its waterfront
Five projects, concentrated in Libreville: an international-brand hotel complex on the seafront, a four-star hotel under study, the rehabilitation of a historic hotel and a hotel built into a new transport facility.
Benin: a state programme
Five projects, almost all carried by the public authorities: the conversion of an upscale Cotonou hotel under an international brand, a four-star hotel, several luxury hotels and a holiday village planned on the coast. Here access goes through public procurement and the general contractors selected.
Côte d'Ivoire: renovations and mixed-use complexes
Four projects: the modernisation of a large historic hotel in Abidjan, two international-brand hotel ensembles in Abidjan, one of them within a mixed-use complex, and a three-hotel programme in inland and coastal cities.
Togo: business hotels and heritage
Five projects: an international-brand hotel and an infrastructure extension in Lomé, a complex financed by an institutional investor on the outskirts of Lomé, and two heritage hotels still to be financed, in Lomé and inland.
How to read these figures
Each project comes from an identified, dated public source: business press, brand announcements, government sites, tender portals. Product families are inferred from the type of property and its stage; they count projects, not volumes. A large resort obviously weighs more than a small city hotel. The tracking is updated continuously; this article is a snapshot at 10 October 2026.
FAQ
Which francophone African countries are building the most hotels in 2026?
In our tracking, Senegal and Cameroon have the most projects (seven and eight), ahead of Gabon, Benin and Togo (five each) and Côte d'Ivoire (four, including large renovations).
Which hotel supplies can a Moroccan manufacturer sell to these projects?
By frequency: furniture and fit-out, lighting, sanitary ware and taps, air conditioning, linen, professional kitchens, tiles, then aluminium joinery, pools and natural stone.
Who places the order: the brand or the owner?
The owner, directly or through its general contractor, on the basis of the brand's specification. The project owner is therefore who to reach: early for technical packages, in the year before opening for decoration and linen.
How does a hotel buyer find qualified Moroccan manufacturers?
Atlas to Africa offers a sourcing mission: a shortlist of three qualified Moroccan manufacturers, with comparable quotes and samples, in fifteen working days, for 5,000 euros excluding tax deducted from the success fee. A simple quote request remains free.
Sources
- Projects: official announcements and business press (publicly announced projects), tracked and checked by Atlas to Africa under our method. The detailed list (projects, owners, stage, needs) is reserved for registered suppliers: become a supplier.
Need to source something from Morocco?
Describe your need; we identify the Moroccan suppliers able to answer it. Free for buyers.