Tool

Landed cost from Morocco: calculator

From ex-works price to delivered-to-site cost: sea freight, insurance, ECOWAS or CEMAC customs duty, levies, import VAT and port charges, for six West and Central African countries. Orders of magnitude to adjust with a real quote.

Estimated landed cost

33,151 € – 34,167 €Landed, all charges and VAT paid, Cotonou
CIF value, arrival port: Cotonou
22,311 € – 23,015 €
Net cost if VAT is recoverable
28,231 € – 29,093 €
Multiplier on the ex-works price
× 1.66 – 1.71
Indicative sea transit from Casablanca or Tanger Med
12–16 days
Itemlowhigh
Ex-works price (EXW)20,000 €20,000 €
Morocco side: haulage to port, export clearance, handling400 €400 €
Sea freight1,800 €2,500 €
Insurance (0.5%)111 €115 €
Customs duty (20 %)4,462 €4,603 €
Community and statistical levies (2.5 %)558 €575 €
Import VAT (18 %)4,920 €5,075 €
Arrival port: handling, customs file, forwarder, city delivery900 €900 €

Duty applied : ECOWAS CET, cement and structural materials: consumer-goods band, sometimes 10% by tariff line. Levies : statistical fee 1%, UEMOA levy 0.8–1%, ECOWAS levy 0.5%.

Guides by product

The same model applied to one product family, with the breakdown for Dakar and Abidjan.

Model assumptions

Every line can be replaced by your forwarder's figure. Duty depends on the exact tariff line (HS code): ask for it before budgeting.

DestinationCustoms unionImport VATLeviesFreight 20' (€)Freight 40' (€)Transit
Mauritania · Nouakchott (PANPA)CEMAC16 %1.5 % (statistical fee and national levies, order of magnitude; Mauritania belongs to neither ECOWAS nor CEMAC)1 100–1 6001 700–2 4003–5 days
Senegal · DakarECOWAS18 %2.9 % (statistical fee 1%, UEMOA levy 1%, ECOWAS levy 0.5%, COSEC 0.4%)1 500–2 1002 200–3 1005–8 days
Côte d'Ivoire · AbidjanECOWAS18 %2.5 % (statistical fee 1%, UEMOA levy 1%, ECOWAS levy 0.5%)1 700–2 4002 500–3 50010–14 days
Togo · LoméECOWAS18 %2.5 % (statistical fee 1%, UEMOA 0.8%, ECOWAS 0.5%, African Union 0.2%)1 800–2 5002 600–3 60012–16 days
Benin · CotonouECOWAS18 %2.5 % (statistical fee 1%, UEMOA levy 0.8–1%, ECOWAS levy 0.5%)1 800–2 5002 600–3 60012–16 days
Cameroon · DoualaCEMAC19.25 %1.5 % (CEMAC integration tax 1%, OHADA 0.05%, IT fees: to confirm)2 100–2 9003 000–4 20016–22 days
Gabon · Libreville (Owendo)CEMAC18 %2 % (CEMAC integration tax 1%, IT fee, reduced VAT rates on listed products)2 300–3 2003 300–4 60018–24 days

Morocco side: EUR 400 per container (haulage, export clearance, handling; exports leave without VAT). Arrival port: EUR 900 per container (handling, customs file, forwarder, city delivery). Insurance: 0.5% of value. Exchange rate: 10.8 MAD per EUR.

Duty bands by product family

Moroccan goods enter as third-country goods, at each union's common external tariff. The calculator applies the most frequent band; the exact line may differ.

FamilyECOWASCEMACMauritaniaWhy
Medical gases5 %5 %5 %medical equipment: reduced rate
Hospital beds & furniture5 %10 %5 %medical furniture: 5 to 10% by tariff line
Sterilization5 %10 %5 %sterilisers: medical capital goods
Laboratory equipment5 %10 %5 %laboratory equipment: capital goods
Medical consumables & pharma0 %5 %0 %medicines at 0%, consumables at 5%
Medical equipment & devices5 %5 %5 %medical devices: reduced rate
Solar & energy storage5 %10 %5 %panels and inverters: capital goods, frequent solar exemptions
Generators & power systems5 %10 %5 %generators: capital goods
Lighting20 %30 %20 %luminaires: final consumer goods
HVAC & cold10 %20 %13 %HVAC: equipment at 10%, consumer split units often 20%
Lifts & escalators5 %10 %5 %lifts: capital goods
Electrical equipment & cables10 %20 %13 %cables and switchgear: 10 to 20% by tariff line
Sanitary ware & faucets20 %30 %20 %sanitary ware and taps: final consumer goods
Marble & natural stone20 %30 %20 %worked stone: final consumer goods
Ceramics & tiles20 %30 %20 %ceramic tiles: final consumer goods
Paints, coatings & waterproofing20 %30 %20 %paints and coatings: 10 to 20% by tariff line
Aluminium, doors, windows & glazing20 %30 %20 %finished joinery: consumer goods; raw profiles at 10%
Plumbing, pipes & water10 %20 %13 %pipes and fittings: intermediate goods
Professional kitchens & laundry10 %10 %13 %professional kitchen and laundry equipment: capital or intermediate goods
Textiles, linen & workwear20 %30 %20 %linen: final consumer goods
Furniture, FF&E & fit-out20 %30 %20 %furniture: final consumer goods
Pools, spa & landscaping20 %30 %20 %pool equipment: consumer goods; pumps at 10%
Safety, security & signage10 %20 %13 %safety and signage: intermediate goods
Steel & metal structures10 %20 %13 %structures and profiles: intermediate goods, some lines at 20%
Cement, concrete & building materials20 %20 %20 %cement and structural materials: consumer-goods band, sometimes 10% by tariff line
Packaging10 %20 %13 %packaging: intermediate goods
Agricultural & agro-industrial equipment5 %5 %5 %agricultural machinery: capital goods, often exempt
Pumps, motors & compressors5 %10 %5 %pumps and motors: capital goods
Plastics & chemicals10 %20 %13 %chemicals and plastics: intermediate goods
Industrial machinery & equipment5 %10 %5 %industrial machinery: capital goods
Engineering, architecture & contracting0 %0 %0 %services: no customs duty, local service taxation

Markets covered: Côte d'Ivoire, Senegal, Cameroon, Gabon, Benin, Togo, Mauritania.

Frequently asked questions

How do you calculate the landed cost of Moroccan goods in Dakar or Abidjan?+

Ex-works price, plus haulage to the Moroccan port and export clearance, plus sea freight and insurance (CIF value), plus customs duty at the common external tariff, plus community levies, plus import VAT computed on the whole, plus arrival port charges and delivery. The calculator chains these steps and shows a range.

What customs duty applies to a Moroccan product in West Africa?+

Morocco is a member of neither ECOWAS nor CEMAC: its goods are taxed at the common external tariff, 0 to 35% by category. Capital goods are generally at 5%, intermediate goods at 10%, consumer goods at 20% (ECOWAS) or 30% (CEMAC).

How much does a container from Casablanca to Dakar cost?+

Order of magnitude in 2026: EUR 1,500 to 2,100 for a 20-foot and EUR 2,200 to 3,100 for a 40-foot container, excluding port charges, for 5 to 8 days at sea. To Abidjan, count 10 to 14 days and 15 to 20% more; to Douala or Libreville, 16 to 24 days and 35 to 50% more.

Is import VAT a final cost?+

It is paid at customs clearance. A VAT-registered buyer recovers it afterwards; for an individual or a non-registered body it is a final cost. The calculator shows both readings.

Why buy in Morocco rather than Asia if the duty is the same?+

Lead time: two to three weeks at sea instead of six to eight, samples and factory visits within reach, and made-to-measure production. On a site whose opening date slips, lead time is often worth more than the price gap.

Sources